Inbuilt Ferrocement Structural Formwork |
Thin section Formwork for slabs, beams, columns |
Manufactured on machinery set-up |
Reinforcemet of slabs, beams, columns incorporated in Formwork body |
If required, additional reinforcement can be provided |
Formwork to be left permanently in the structure |
Time saving by about 10-15% and Cost saving about 10% |
The wiremesh in the formwork makes the structures strong with no/negligible requirement for repairs in the life of the structure |
All inbuilt formwork for slabs, beams, columns of the building is well connected and monolith |
It makes the structure best earthquake and cyclone resistant with least damages |
The structure shall not require repairs almost for life time. |
The structure shall resist fire upto 750oC for 48 hours temperature and duration can be increased |