Inbuilt Ferrocement Structural Formwork |
| Thin section Formwork for slabs, beams, columns |
| Manufactured on machinery set-up |
| Reinforcemet of slabs, beams, columns incorporated in Formwork body |
| If required, additional reinforcement can be provided |
| Formwork to be left permanently in the structure |
| Time saving by about 10-15% and Cost saving about 10% |
|
The wiremesh in the formwork makes the structures strong with no/negligible requirement for repairs in the life of the structure |
| All inbuilt formwork for slabs, beams, columns of the building is well connected and monolith |
| It makes the structure best earthquake and cyclone resistant with least damages |
| The structure shall not require repairs almost for life time. |
| The structure shall resist fire upto 750oC for 48 hours temperature and duration can be increased |